Two Floors Steel Structure Workshop
Column:Q355/Q235 H- steel, Box column is also available
Rafter, Beam:Q355/Q235 H- steel
Mahsulotni tanishtirish
Main Structure of Two Floors Steel Structure Workshop | Column | Q355 / Q235 H- po'lat, Qutb ustuni ham mavjud |
Rafter, Beam | Q355/Q235 H- steel | |
Surface processing options | Surface processing options | 1. Epoxy zinc-rich primer plus epoxy mica intermediate paint (120μm thickness) |
2. Hot dip galvanization | ||
Roof System | Roof panel options | 1. Insulated sandwich panel, PU, rock wool, glass fiber, EPS. Two sides is steel sheet. Thickness of roof panel 50mm/75mm/100mm, |
2. Steel plate, thickness 0.4mm/0.5mm/mm | ||
Gutter options | 1. Galvanized steel gutter, thickness 2.0mm/2.5mm, 3.0mm | |
2. Painted, Pre-finished steel gutter, thickness 0.4mm/0.5mm/0.6mm | ||
Door | 1. Roller door for truck, size customized | |
2. Sliding door for truck, size customized | ||
3. Access door, steel door, glass door etc. | ||
Window | PVC or Aluminum frame, Fixed, swing, sliding, louver etc, size customized | |
Steel flashing and cover | Steel sheet end cover and corner cover | |
Accessories and fasteners | Anchor bolts, chemical bolts, high strength bolts, ordinary bolts, self-drilling screws, rivet etc. | |
Other Options | Crane 5T, 6T, 10T, 16T, 30T etc. |
Advantages
Reduce construction cost:
Since light steel structure self-weight is lower than traditional steels, plus adopting light weight roofing system, the whole construction material quantity can be saved, thus reduce the overall construction cost.
Reduce site management costs:
Site management costs can be reduced by 20 percent to 30 percent which can lead to a 3 percent to 4 percent saving in terms of overall building cost Site management costs are reduced because of the shorter construction period.
Ko'p funksiyali binolar:
The light weight nature of the Two Floors Steel Structure Workshop decides that, it can have more function choices like: long span steel construction at the podium level; extreme environment building which requires wind load/snow load/seismic resistant, etc. A complete steel structure warehouses and factories is composed of several different functional systems, mainly including: structure system(including main structure, roof and purlin system, wall and beam system),maintenance system ( including roof panel, wall panel, covering and floor deck), door and window system(including door and window), ventilating system (including clerestory system and ventilators), drainage system (including gutter, rain-spout and awning), etc.
Applications
Steel structure warehouse building;
Steel structure workshop building;
Steel structure carpark;
Steel structure apartment building;
Steel structure shopping mall;
Steel structure airport terminal;
Steel structure aircraft hangar;
Steel structure school;
Steel structure Hotel;
Steel structure office building;
Steel structure retail store;
Steel structure logistic center;
Steel structure sports facilities;
Related Projects
Project Name | Le Tigre Warehouse |
Finished Time | Year 2017 |
Project Place | Nacala Mozambique |
Building Area | 3158 S.qm |
Project Description | In Three floors, with lift and ramp for track, heavy floor loading, wind load 275km/h, all HDG steel structure. |
Project Name | Alain's warehouse |
Finished Time | Year 2017 |
Project Place | New Caledonia |
Building Area | 1150 S.qm |
Project Description | Five floors steel structure warehouse building with elevator, heavy wind loading. |
Philippines: SCPA workshop;
SG Eco workshop-3600sqm Two Floors Steel Structure Workshop with office in 250sqm;
Iriga Factory;
BBL Camp—24 rooms accommodation camp with public services such as dining hall, gym room;
Maria De Sio Resort;
SMMCI Camp—1300sqm office building built by flatpack container house and 2600sqm warehouse
PNG: PNG concrete Development—13 steel structure warehouse in around 1500sqm each;
Virgin Island: 10000sqm Distribution center
Project Name | SMMCI Project |
Finished Time | Year 2013 |
Project Place | South Manila, Philippines |
Building Area | 2600 S.qm warehouse plus 1700sqm office/camp facility |
Project Description | For "San Mining CONST. CORP.", use as onsite warehouse, office, camp and other facilities. Full package provided by us. |
FAQ
Q. Who are you?
A. CBC is a top provider for customized building solutions based in Hangzhou city China.
Q: What can you do for me?
A. CBC provides one-stop building solutions for projects such as:
Steel structure warehouse;
Steel structure apartment;
Steel structure workshop;
Steel structure shopping mall;
Steel structure car-park;
Mining camp;
Construction site camp;
Temporary house;
Low-cost house;
Vocational house;
Luxury residential house;
Resort villa;
Refugee house;
Isolation room;
Tiny House Expandable Container Homes
Q: What about the installation for a Two Floors Steel Structure Workshop?
A: We'll provide the detailed installation drawing, supervisor guiding installation is also available. We can do turn-key job for some kind of projects.
Q: What's the benefits to cooperate with CBC?
A: To cooperate with CBC so that you can benefit from the professional services provided by the engineer team and commercial team:
Quick response;
Cost saving;
Free design;
Full range of options to meet with your special requirements;
One-stop solution to save your time and min. the communication troubles;
BIM system which can be relied for a lifetime period of the project;
Q: What's your supply capacity?
A: Annual production capacity details are as follows:
Container house: 7200sets
Prefab house; 564000 square meters
Steel structure: 360000 square meters.
Q: How can you guarantee the project can be approved by local authority?
A: 1) All customized designs based on your detailed requirements;
2) All materials can meet with local standards;
3) Structure calculations provided free to help to get approval;
4) More than 10 Years' oversea project experiences prepared us well for any questions.
Sizga ham yoqishi mumkin
So'rov yuborish